Working with the Smithonsian Institution, McKissack helped the National Museum of African American History and Culture development team switch from the classic design-bid-build approach to a construction manager-at-risk delivery.
This PowerPoint was originally presented at a Construction Owner's of America Association conference in 2016. You can now view the full presentation by accessing it from the Media Downloads side bar.